Hargassner Boilers
<< New text box >>
All Hargassner products have low emissions and are highly efficient (94%). They have easy to use controls that allow you the freedom to sit back and relax, just as you would a normal heating system and with automatic cleaning and de-ashing as standard, life is easy. As a distribution partner for WoodEnergy BEBuk can pass on direct support for further piece of mind. For more information on Hargassner boilers please visit www.woodenergy.com
Wood Pellet Boilers 3kW-199kW
The advantages
- Pellet suction feed or direct auger
- Highest Efficiency over 95% – tested and certified!
- Low temperature boiler: Down to 38°C (optional with low temp version HSV 9-22 kW))
- Fully refactory-lined combustion chamber for high-temperature combustion
- Lambda Sensor with fuel-quality detection
- Automatic ash level indication
- Ashbox compression system permitting extended ash box emptying periods
- Ease of use through SMS module or remote monitoring via PC connection
- Induced draught fan creating optimum fuel efficiency and safety regardless and independent of the natural chimney draft
- Negative pressure sensor – safety feature ensuring the boiler shuts down if flue gasses enter the plant room
- Automatic sliding grate – fully automatic combustion chamber cleaning (150-kW and 199kW boilers have a moving step grate)
- Automatic turbulator cleaning
- Air sealed double rotary valve – 100% burn-back protection boiler and boiler can re-fuel whilst still ignited
- 5 year warranty with warranty extensions available subject to service and maintenance contracts.
- 30 years of manufacturing since 1984
- With the exception of a minor number of components such as auger motors, all parts are manufactured by Hargassner in Austria.
Wood Chip Boilers 7-199kW
The advantages – model dependant
- Highest Efficiency over 90% - tested and certified!
- Mulitifuel version (Agrofire 25kW to 40kW only) permits the burning of wood pellets, miscanthus, straw and grain)
- Fully refactory-lined combustion chamber and flame concentration plates for high-temperature combustion
- Lambda Sensor with fuel-quality detection
- Ashbox compacting system permitting extended ash box emptying periods
- Ease of use through SMS module or remote monitoring via PC connection
- Induced draught fan creating optimum fuel efficiency and safety regardless and independent of the natural chimney draft
- Negative pressure sensor – safety feature ensuring the boiler shuts down if flue gasses enter the plant room
- Automatic sliding grate – fully automatic combustion chamber cleaning (150-kW and 199kW boilers have a moving step grate)
- Automatic turbulator cleaning
- Air sealed double rotary valve – 100% burn-back protection boiler and boiler can re-fuel whilst still ignited
- Ingenious single motor technology – controls boiler cleaning, fly ash transport, grate ash removal and ash transport to ash box.
- 5 year warranty with warranty extensions available subject to service and maintenance contracts.
- 30 years of manufacturing since 1984
- With the exception of a minor number of components such as auger motors, all parts are manufactured by Hargassner in Austria.
- Option: Wood log combustion
Green Heat Module
Where customers don’t have the internal space available for a biomass heating boiler and fuel store, we offer a fully containerised solution which houses both of these in a single unit.
The Green Heat Module arrives at your site on the back of a lorry, fully-fitted out, and is linked to your distribution system via a single flow and return connection. Low Loss Headers can be introduced within the Module for multiple hydraulic ‘hook ups’.
The main benefits of this approach are faster installation and reduced business interruption - as well as increased life of the biomass boiler due to the fully controlled environment (unlike a cold un-insulated shipping container) In addition, where a business may potentially move premises, it is possible to also move the container while still claiming the Renewable Heat Incentive at the same rate as when it was first commissioned.
The Wood Energy Green Heat Modules are secure,
providing excellent protection against theft and
vandalism. There are also a number of aesthetic options to allow them to blend
into your environment. They can be pre-painted in a range of colours, clad in various materials or vinyl wrapped with imagery of your choice.
Total Warranty, Total Peace of Mind – for the Life of the RHI
The main concerns from a number of clients relates to the certainty of the RHI payments and boiler longevity. The RHI payments are linked to the boiler serial number.
If the boiler breaks down and is irreparable, then the on-going RHI payments are lost. This can be catastrophic if the boiler failure occurs early on in the life of the boiler and even worse still if the boiler is outside of the warranty period – which is normally less than 5 years.
If a re-submission of RHI is required it is likely that it will be at the new, and much reduced rates. This is because RHI payments are set to degress (for new comers to the scheme) at regular intervals.
Wood Energy Ltd understands that these risks are significant, and for some clients, unacceptable. Therefore, Wood Energy Ltd provides a Total Warranty for our Green Heat Module containerised solutions.
A Total Warranty for the whole Green Heat Module is included within the cost. These would typically include, but are not limited to;
- Module has a 25yr thermal integrity warranty
- Module has a 25yr structural integrity warranty
- Module has a 20yr boiler warranty*
- Module has a 40yr paint coating warranty. Module paint coating does not require annual inspection and is a maintenance free product of up to 40 years Inland and 30 years for a Coastal application / installation.
- Module ‘Total Coating’ Warranty goes direct to the building owner, and is fully transferable should the Module be sold to another party.
* The Total Warranty is only available if the client enters into a Wood Energy Ltd Warranty & Maintenance Service Contract at time of order. The Total Warranty is only available for Green Heat Module containerised solutions.